Green Infrastructure
PVPC has a range of projects to support and advance the use of green infrastructure in the region for mitigation of stormwater flows and urban heat island impacts.
Green Infrastructure
PVPC has a range of projects to support and advance the use of green infrastructure in the region for mitigation of stormwater flows and urban heat island impacts.
Massachusetts has made real strides to develop clean energy and efficiency upgrades for residents. However, there are several challenges to overcome to deliver these benefits to low- and moderate-income households.
TIP is a Five-year schedule of priority highway, bridge, transit, and multimodal projects identified by year and location complete with funding source and cost. The TIP is developed annually and is available for amendment and adjustment at any time. Each program year of the TIP coincides with the Federal Fiscal Year calendar, October 1 through September 30.
A Complete Street is a street designed to accomodate all users in a safe, convenient, and comfortable manner.
Streets direct people; they movegoods; they accommodate cars,buses, and bicycles; they provide social connections, and ultimately they establish the
platform for the rest of the city to build upon.
“A staged, multiyear, intermodal program of transportation projects which is consistent with the metropolitan transportation plan.”
he Pioneer Valley Planning Commission (PVPC) collects daily traffic count information at sample locations across the 43 cities and towns in Hampden and Hampshire Counties under contract with the Massachusetts Department of Transportation
The Transportation Improvement Program (TIP) is a requirement of the Metropolitan Transportation Planning Process as described in the Metropolitan Planning Final Rule 23 CFR 450 section 324. This regulation developed by the
The 2018 to 2022 Transportation Improvement Program (TIP). The TIP is a five-year fiscally constrained schedule of priority highway, bridge, transit,